
Truck bays, crew quarters, gear storage, MEP systems, and life-safety features built to code with specialized coordination.
Fire Stations work, run with discipline.
Fire stations are mission-critical, mixed-use buildings: heavy apparatus bays, 24-hour crew quarters, gear and decontamination space, and the mechanical, electrical, and life-safety systems that have to work when seconds count.
Bihn Construction builds fire stations to code with the specialized coordination they demand. Drive-through bays get slabs sized for apparatus axle loads, trench drains and oil-water separators, and an apron graded for the turning radius the trucks need. Vehicle exhaust is captured at the source, station and bunk alerting is wired for a fast, safe turnout, and where the department runs it, traffic-signal preemption is coordinated at the apron. Because the station cannot go dark, we carry a standby generator and automatic transfer switch for continuous operation, and we detail the turnout-gear decontamination around a clean hot-zone and cold-zone separation with gear extractors and breathing-air fill.
We coordinate closely with the department on apparatus and operations throughout, and where the work replaces an active station, we phase it or stand up temporary quarters so the company stays in service. The result is a station built to perform under daily emergency response and to serve the crews who live and work in it.
Fire Stations
- Project Type
- Fire / Emergency Station
- Critical Systems
- Alerting · Backup Power
- Emphasis
- Life Safety · MEP
- Delivery
- Ground-up · Renovation
What we deliver for Fire Stations.
- 01
Apparatus Bays & Slabs
Drive-through bays, axle-load slabs, trench drains and oil-water separators, and an apron graded for apparatus turning radius.
- 02
Crew Quarters & Living Space
Durable 24-hour living quarters, dayroom, and kitchen detailed for crews who occupy them around the clock.
- 03
Vehicle-Exhaust & MEP Systems
Source-capture vehicle exhaust with mechanical, electrical, and plumbing systems coordinated and tested.
- 04
Alerting, Preemption & Backup Power
Station and bunk alerting, traffic-signal preemption at the apron, and a standby generator and transfer switch for continuous operation.
- 05
Gear Decontamination & Health Design
Hot-zone and cold-zone separation, gear extractors, and breathing-air fill detailed to current firefighter-health practice.
- 06
Continuity & Department Coordination
Phasing or temporary quarters to keep an active company in service, with close coordination on apparatus and operations.
Built with purpose: precision + partnership.
A disciplined four-phase process keeps every project aligned, from first site visit to final walkthrough. And our commitment does not stop there.
Predesign
Preconstruction
Construction
Post-Construction
Built across the Upstate.

Steel-Frame Commercial Build
Greenville, SC
Active Jobsite · Field Coordination
Mauldin, SCOther commercial sectors.
Every sector · specialized coordination of apparatus bays, MEP, alerting, and life-safety systems, built to code.
All 12 Sectors →Fire Stations, answered.
We deliver fire stations projects across Greenville and the Upstate, managing every trade with disciplined planning, accurate budgets, clean coordination, and milestone inspections so your facility opens on time and performs long-term.
Yes. Bihn Construction is a licensed South Carolina general contractor, bonded and fully insured on every project, with a single point of accountability from preconstruction through closeout.
We surface site conditions and risks in preconstruction, lock budgets and permits early, prequalify every subcontractor, and track cost and schedule transparently from mobilization through turnover.
Yes. We routinely phase work around active operations with strict safety controls and daily communication, so your facility keeps running while we build.

Plan your fire stations project with Bihn.
Tell us about your fire stations facility, timeline, and budget. We'll bring specialized coordination of apparatus bays, MEP, alerting, and life-safety systems, built to code, plus a single point of accountability from preconstruction through closeout. Most consultations are scheduled within 48 hours.
