Skip to content
Bihn Construction
Pump Stations public works construction by Bihn Construction in Upstate South Carolina
Public Works / Pump Stations

Lift and pump stations with structural, mechanical, and electrical scope coordinated and tested before turnover.

Division
Public Works
Scope
03 / 08
Discipline
Mechanical / Lift Structures
Status
To Spec / To Code
Discipline Set / Pump Stations
WET WELL / DRY WELL
STRUCTURAL SET
MECHANICAL + ELECTRICAL
CONTROLS INTEGRATION
TESTED
AS-BUILT VERIFIED
Overview / Scope 03 / 08

Pump Stations

Coordinated, tested, and proven before turnover.

01

Lift and pump stations bring structural, mechanical, and electrical scope together in a tight footprint. Wet wells, dry wells, and equipment pads are formed and set to tolerance, and the pumps, valves, piping, and controls are coordinated so the station fits, fits together, and serves access for the operators who will maintain it.

02

Sequencing is planned around long-lead equipment and the tie-ins to existing infrastructure. Electrical service, instrumentation, and control integration are coordinated with the design team so the station can be energized and proven out cleanly.

03

Every station is tested before turnover and handed over with commissioning records and accurate as-builts. The asset performs on day one, and the documentation supports it for years.

Engineering Discipline

The standard pump stations demands.

Coordinated, tested, and proven before turnover. Public works structures carry public safety and public dollars. We run them with commercial-grade oversight, documented controls, and a single point of accountability from mobilization to as-built closeout.

01

Bonded & Licensed

Licensed South Carolina general contractor. Bonded and fully insured on every project.

02

Construction Quality

Commercial-grade oversight: verified subs, premium materials, disciplined inspections.

03

Safety Standards

Job sites run the right way, with safety controls and protocol that protect crews and clients.

04

Subcontractor Prequalification

A vetted network of trade partners proven on quality, safety, and capacity.

05

Building Code Expertise

Deep familiarity with local code and the approvals that keep projects moving.

06

Coordination Services

Single point of accountability across every trade, from preconstruction to closeout.

Selected Work

Public works projects.

Full Portfolio
Spillway & Water-Control Structure · Public Works, Upstate, SC
Public Works

Spillway & Water-Control Structure

Upstate, SC
Site Development · Upstate · Public Works, Anderson, SC
Public Works

Site Development · Upstate

Anderson, SC
Questions

Pump Stations, answered.

Yes. pump stations is part of our public works division, built to engineered tolerances with rigorous inspection, clean coordination, and accurate as-built documentation.

We deliver public and engineered work with strict documentation, environmental controls, and inspection coordination that satisfy owners, municipalities, and design teams.

Permits, erosion and sediment control, and environmental compliance are planned in preconstruction and managed daily on site, so engineered work proceeds without regulatory delays.

Yes. Bihn Construction is a licensed South Carolina general contractor, bonded and fully insured on every project, with a single point of accountability from preconstruction through closeout.

Built to Outlast Us.

Plan your pump stations project with Bihn.

Bring us your spec, your schedule, and your agency requirements. Most consultations are scheduled within 48 hours.